Construction Programme of Works — Auto-Drawing Gantt Chart (Excel)
Downloadable

Construction Programme of Works — Auto-Drawing Gantt Chart (Excel)

(0 Ratings)
1
$5.90$7.37

Set two numbers per activity. Your Gantt chart draws itself.


Description


Stop building your programme of works from scratch in MS Project or fighting Excel bars by hand. This template gives you a complete, professional 8-phase construction programme: Preliminaries through Testing & Commissioning & Handover, with the Gantt bars drawing automatically from just two inputs per activity.

What's inside:

  • Full Programme of Works sheet — 8 phases, activity-by-activity breakdown, auto-drawing Gantt bars
  • Enter Duration (weeks) and Start Week — Finish Week and the bar chart updates instantly
  • Change one cell (Project Start Date) and every weekly date across the whole programme shifts with it
  • Phase Summary roll-up — durations and % complete by phase, ready to drop into a client report
  • Predecessor and Responsible Party columns for logic and accountability
  • "How to Use" sheet — step-by-step instructions, no guesswork
  • "Assumptions & Legend" sheet — documents how the template works so you can hand it to a client or team member with confidence


Who this is for: QS professionals, site engineers, contractors, project managers, and construction students who need a credible, presentable programme, fast, without paying for MS Project or building one from a blank sheet every time.


Format: Excel (.xlsx) · Instant download · Editable, reusable on unlimited projects


P.S. Pair this with the Weekly Site Progress Report (same 8 phases, zero relabeling) and save ₦3,000 as the Site Management Kit. https://selar.com/22a009233x

Frequently bought together

© 2026 Aisha Suleiman. All Rights Reserved.

Powered By